We had 8 rocketeers put up ?? flights.
We shot off everything that was not nailed down.
Hope to see everyone there.
A total of 50 motors were burned in 8 hours with total newtons of 1532.5 N-S which is equal to a K motor. That's one motor every 9.6 minutes.
The break down of motors was:
Thanks all for a fun safe shoot with lots of rocket talk.
Our next launch is scheduled for lex at MSP on 5-13-06